BAS submittal guides
How to build each piece of a building automation submittal: the network riser, the points list, the sequences. Written from real specifications by a BAS engineer.
GuidesHow to make a BAS network riser diagramWhat a BAS network riser diagram must show, how the BACnet/IP backbone and MS/TP trunks are laid out, and a step-by-step method that matches real specs.
GuidesWhat goes in a BAS points listThe columns a BAS points list needs, the BACnet point types, and a method to build it from the control schematic. Free Excel template included.
GuidesBAS controls submittal checklistEvery item a BAS controls submittal usually contains, from schematics and riser to points list, sequences, PICS and record drawings, as listed in real specs.
GuidesBACnet device instance numbering and MS/TP addressingThe rules for BACnet device instances, MS/TP MAC addresses, Max Master and network numbers, with segment limits and a numbering scheme you can reuse.
GuidesHow to write a sequence of operationsWhat a sequence of operations covers, how to structure it by mode, how it ties to the points list, and where ASHRAE Guideline 36 fits.
GuidesBAS point naming conventionsHow to name BAS points so the controller, the front end, the points list and the sequences agree, with abbreviations, examples and tagging standards.
Free trial
Your next submittal, consistent from day one.
Start with one of your current jobs. Change a device and watch the riser and the points list follow.
7 days free · cancel in one click
- WRITE[email protected]
- VISITstructioarchi.com/en
Bassirou Thiam · founder of Structio