How to write a sequence of operations

By Bassirou Thiam, building automation engineer · Updated

A sequence of operations is the written description of how each system is controlled: in which modes it runs, what starts and stops it, which setpoints it holds and how, and what happens on alarms and safeties. Specs require it in the submittal and expect it to refer to the point names of the points list.

What should each sequence cover?

  • The system: what equipment the sequence controls and which controller runs it.
  • Modes: occupied, unoccupied, warm-up, cool-down, and how the system switches between them.
  • Start and stop: schedules, interlocks, start-up order, proof of operation.
  • Control loops: each setpoint, the sensor it reads and the device it drives.
  • Alarms and safeties: freeze protection, smoke shutdown, high and low limits, what is hardwired and what is software.
  • Adjustable values: which setpoints and timers the operator can change.

How does it tie to the points list?

Specs ask that the sequences cross-reference the system point names. In practice: every point mentioned in the sequence exists in the points list under the same name, and every point in the list is used by a sequence or by monitoring. Checking the two against each other catches most review comments before they happen.

Where does ASHRAE Guideline 36 fit?

ASHRAE Guideline 36, High-Performance Sequences of Operation for HVAC Systems, first published in 2018 and updated since, gives standardized, detailed sequences for common systems such as multiple-zone VAV air handlers, terminal units and central plants. When the engineer specifies it, the contractor's job is to implement those sequences and document any deviation, not to rewrite them.

Write it for the person who will commission it

One system per section, short numbered statements, one action per statement, real point names and real setpoint values. The technician at startup should be able to test it line by line.

Sources

  1. Siemens, guide specification Section 23 09 00 – Building Automation System (submittals, network, point naming)
  2. ASHRAE, Guideline 36: High-Performance Sequences of Operation for HVAC Systems (training page)
  3. ASHRAE, New guideline on standardized advanced sequences of operation for common HVAC systems
  4. WBDG, UFGS 23 09 00 – Instrumentation and Control for HVAC (U.S. Department of Defense)

Related

Free trial

Your next submittal, consistent from day one.

Start with one of your current jobs. Change a device and watch the riser and the points list follow.

7 days free · cancel in one click

Bassirou Thiam · founder of Structio