What goes in a BAS points list

By Bassirou Thiam, building automation engineer · Updated

A BAS points list is the table of every input and output each controller handles: point name, point type (AI, AO, BI, BO or a software value), the field device it reads or drives, and where that device sits. Specs ask for one per system controller, and the sequences and graphics refer to its point names.

Which columns does a points list need?

A typical guide specification asks for a point list for each system controller including inputs and outputs, point numbers, the controlled device associated with each point, and the location of that device. Most contractors add a few columns that save time at checkout:

ColumnWhat it holdsExample
ControllerThe controller or panel that owns the pointAHU-1 controller, TCP-2
Point nameThe unique name used everywhere: controller, front end, sequencesAHU1-SAT
DescriptorA short readable descriptionSupply air temp
Point typeAI, AO, BI, BO, or a software value (AV, BV, MSV)AI
Field deviceWhat the point reads or drivesDuct temperature sensor
Signal / unitsElectrical signal and engineering units10k thermistor, °F
LocationWhere the device is installedAHU-1 supply duct, Mech Room 101
Alarm / trendWhether the point alarms or is trendedAlarm high/low, trend 15 min

What are the point types?

Physical points are wired to a controller terminal. Software points live inside the controller. In BACnet terms:

TypeMeaningTypical use
AIAnalog inputTemperature, pressure, humidity sensors
AOAnalog outputValve or damper actuator, VFD speed command
BIBinary inputFan status, filter alarm, freeze stat
BOBinary outputFan or pump start/stop
AV / BV / MSVAnalog, binary or multi-state valueSetpoints, modes, occupancy schedule

Counting physical points by type is how you size controllers: the I/O summary tells you how many inputs and outputs of each kind every controller needs.

How do you build it from the control schematic?

Start from the control schematic. Take each component, one at a time, and ask what the sequence needs to read from it and what it needs to command. A supply fan, for example, gives a start/stop output, a status input and, with a VFD, a speed command. Repeat for every coil, damper, sensor and safety, then group the points by controller.

Name the points as you go, with one naming rule for the whole job (see BAS point naming conventions). The sequence of operations should then refer to those exact names.

Free template

The template below has the columns above and one worked example: a constant-volume air handler with mixed air dampers, a chilled water coil and a hot water coil. Replace the example with your own job.

Sources

  1. Siemens, guide specification Section 23 09 00 – Building Automation System (submittals, network, point naming)
  2. AutomatedBuildings.com, how to start a point list from the control schematic (2018)
  3. UConn, Appendix V – Building Automation Standards
  4. WBDG, UFGS 23 09 00 – Instrumentation and Control for HVAC (U.S. Department of Defense)
  5. BACnet International, about BACnet (ANSI/ASHRAE Standard 135)

Related

Free trial

Your next submittal, consistent from day one.

Start with one of your current jobs. Change a device and watch the riser and the points list follow.

7 days free · cancel in one click

Bassirou Thiam · founder of Structio